Jansen
https://www.jansen.com/en/index.html
Approved fire protection
An ice rink, a triple gymnasium, four sprint tracks with a length of 80 metres, 3000 square metres of athletics training areas, 25 double rooms and additional areas for the wide range of research, health management and nutrition - the OYM ("On Your Marks") offers athletes a highly specialised athletics infrastructure on a total of eight floors. Fire protection plays a vital role; Janisol 2 EI30 and Janisol C4 EI60 came into use.
Project details
Ambit
Doors
Doors
Products
Janisol C4 Fire protection door EI60/EI90
Janisol 2 Fire door and fire-resistant partition EI30
Janisol C4 Fire protection door EI60/EI90
Janisol 2 Fire door and fire-resistant partition EI30
Finish
2020
2020
- Architecture
Lüscher Architekten AG, Zurich/ CH
Axess Architekten AG, Zug/ CH
- Metal construction
Hobler Metallbau AG, Muri/ CH